Planning
From a first chat to a decision from the council. We draw, submit, negotiate and chase for you.
Proposed ground floor plan, Wheatridge
How it works
Five steps to planning.
What happens, and roughly when, from the first visit to a decision from the council. Scroll and watch the plan take shape.
Project
Rear extension
Stage
Meet and brief
Drawn by
PSK Architect
- 1
Week 1
Meet and brief
We visit your home, talk through what you need and what the house could take. No charge, no obligation.
- 2
Weeks 3 to 4
Measured survey
We measure the existing house, floors and elevations. A few hours on site depending on the size.
- 3
Weeks 6 to 7
Proposals and changes
A full CAD survey and sketch designs, often with a couple of options. We meet to go through them and make changes.
- 4
Weeks 8 to 9
Final design and submission
Layouts confirmed and the planning drawings prepared. We submit the application to the council for you.
- 5
8 to 12 weeks once validated
Planning submitted
A 21 day consultation, then the case officer's review. We deal with any questions and keep you posted until the decision.
Timescales are a guide. Some applications take 10 to 12 weeks, some longer depending on the property and the scheme.
Our approach to your project
Planning can be demanding. Our standard package covers the drawings, the Ordnance Survey plans and the submission itself. If the council comes back with questions we deal with them, and if a scheme needs negotiating we negotiate it.
What's included
- Plan and elevation drawings
- Design options and meetings
- OS maps and block plans
- Application submission
- Planning officer negotiation
- Listed building and conservation area applications
Standard planning package
- ·Professional plan and elevation drawings
- ·Design options and meetings as needed
- ·Ordnance Survey maps and block plans
- ·Submission of your application to the council
Some items carry fees that are chargeable.
Also available
- ·Negotiation with planning officers
- ·Building regulation drawings
- ·Building specifications
- ·Structural engineer liaison
- ·Site surveys
- ·Builder quotations and recommendations
Explore our projects by type
Related articles

Planning and regulations ·
The secret to successfully obtaining planning permission
Getting over the planning hurdle before a build can start.
Read
Planning and regulations ·
What is the 45 degree rule for extensions?
The guideline that limits how an extension affects the neighbours.
Read
Planning and regulations ·
How To Start Renovating a Listed Building
Listed building grades, consent and where to start with a renovation or extension.
Read
Ready to create some extra space?
The first visit is free and there is no obligation. We work across Gloucestershire and the South West.