    Services

    Architectural services

    Planning, building regulations and consultancy. The same three services, whether you are extending a house or building a depot.

    Existing and proposed plans, South Winds

    Proposed ground floor plan, Wheatridge
    Proposed ground floor plan, Wheatridge
    Taking the stress out of it

    Planning

    From a first chat to a decision from the council. We draw, submit, negotiate and chase for you.

    • Plan and elevation drawings
    • Design options and meetings
    • OS maps and block plans
    • Application submission
    Planning
    Building regulation plans, Charlton Kings
    Building regulation plans, Charlton Kings
    Drawings your builder can price and build from

    Building Regulations

    Building regulation drawings and specifications, coordinated with the structural engineer.

    • Building regulation drawings
    • Building specifications
    • Structural engineer liaison
    • Fire safety compliance
    Building Regulations
    Concept section, Shurdington Community Centre
    Concept section, Shurdington Community Centre
    Advice before you commit

    Consultancy

    Site appraisals, feasibility, design advice and sustainable design, so you know what a building or plot can do.

    • Site appraisal
    • Feasibility studies
    • Concept design and options
    • Specialist reports arranged
    Consultancy

    How it works

    Five steps to planning.

    What happens, and roughly when, from the first visit to a decision from the council. Scroll and watch the plan take shape.

    Project

    Rear extension

    Stage

    Meet and brief

    Drawn by

    PSK Architect

    1. 1

      Week 1

      Meet and brief

      We visit your home, talk through what you need and what the house could take. No charge, no obligation.

    2. 2

      Weeks 3 to 4

      Measured survey

      We measure the existing house, floors and elevations. A few hours on site depending on the size.

    3. 3

      Weeks 6 to 7

      Proposals and changes

      A full CAD survey and sketch designs, often with a couple of options. We meet to go through them and make changes.

    4. 4

      Weeks 8 to 9

      Final design and submission

      Layouts confirmed and the planning drawings prepared. We submit the application to the council for you.

    5. 5

      8 to 12 weeks once validated

      Planning submitted

      A 21 day consultation, then the case officer's review. We deal with any questions and keep you posted until the decision.

    Timescales are a guide. Some applications take 10 to 12 weeks, some longer depending on the property and the scheme.

    What is in the planning package
    Architectural visualisation of a contemporary commercial building with glazed frontage

    Ready to create some extra space?

    The first visit is free and there is no obligation. We work across Gloucestershire and the South West.